Westley - Marshall Substation and Transmission Line Project

4 Documents in Project

Summary

SCH Number
2006032075
Lead Agency
Turlock Irrigation District
Document Title
Westley - Marshall Substation and Transmission Line Project
Document Type
NOD - Notice of Determination
Received
Posted
11/15/2006
Present Land Use
Agricultural
Document Description
The Turlock Irrigation District (TID) is planning the construction and operation of two new substations and transmission facilities. Proposed facilities include: - A double-circuit 115-kV transmission line between the existing Marshall Substation located on Marshall Road east of Ward Avenue adjacent to the Delta-Mendota Canal and the proposed Westley Substation to be located on the south side of the existing MID/TID 230 kV Westley Switching Station. Two alignments were considered in the EIR (Segments 1 plus 3 or Segments 2 plus 3). - A double-circuit 115-kV transmission line connecting either transmission line Segments 1 plus 3, or 2 plus 3 with a second proposed substation to be located between Donkin Road to the north and Sperry Avenue to the south, and between the Delta-Mendota Canal to the west and Baldwin Road to the east. Nine substation sites were considered in the EIR. To provide connections to the 9 sites, transmission line segments A through M were considered to connect the new transmission line to the new substation.

Contact Information

Name
Greg Tucker
Agency Name
Turlock Irrigation District
Contact Types
Lead/Public Agency

Location

Cities
Patterson
Counties
Stanislaus
Cross Streets
Westley Substation to be located adjacent to and on the south side of the existing MID/TID 230 k
Zip
95363
Total Acres
3.3 and 3.0
Parcel #
Numerous
State Highways
Yes
Airports
Yes
Schools
Yes
Waterways
Yes
Township
5S, 6S
Range
7E, 8E
Section
1-3,
Base
MDB&M
Other Information
Cross Streets: kV Westley Switching Station. North-south transmission line to connect the proposed Westley Substation to the existing Marshall Substation. Substation 2 to be located between Zacharias Road and Sperry Ave near Rogers Road. East-west-oriented transmission line from either Segment 1 or 2 to Substation 2. Sections: 6-8, 16-18, 20-22, 27, 28, 33-35.

Notice of Determination

Approving Agency
Turlock Irrigation District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print