Johnson Trust Lot Line Adjustment

2 Documents in Project

Summary

SCH Number
2006032062
Lead Agency
Humboldt County
Document Title
Johnson Trust Lot Line Adjustment
Document Type
NOD - Notice of Determination
Received
Posted
4/24/2006
Present Land Use
The northerly of the three (3) parcels is developed with a residential complex consisting of a large house, an old barn, a shed and a pool with a pool house. The parcel is surrounded on the east and north by single family residences. Areas to the south and west are wooded and are comprised of gulches and other natural features. CEQA review is required for this LLA because, without LLA, the <e> lots would be landlocked and virtually unbuildable. Residential Low Density (RL); Eureka Community Plan (ECP). Density: 1-6 units/acre. Residential Single Family- 6,000 sq ft minimum w/ a Greenway/Open Space combining zone (R-1*/GO)

Document Description
A Lot Line Adjustment to reconfigure three (3) separate legal parcels to allow more appropriate access and building sites on the two undeveloped parcels. Existing residential development will all be sited on proposed Parcel 2. Area is served by community water and sewer. There are considerable slopes encumbering the property which may require the preparation of an R-2 Soils Report to determine site suitability. House sites have been identified on this map above the 20% break in the slope for Parcels 1 and 3.

Contact Information
Alyson Hunter
Humboldt County Community Development Services
3015 H Street
Eureka, CA 95501

Phone : (707) 268-3731
ahunter@co.humboldt.ca.us

Location

Cities
Eureka
Counties
Humboldt
Cross Streets
William and Spruce Streets
Zip
95501
Total Acres
+/-22
Parcel #
18-281-01, -291-01, -03
Schools
Grant Elementary
Waterways
Martin Slough
Township
5N
Range
1W
Section
34
Base
HBM

Notice of Determination

Approving Agency
Humboldt County Planning Commission
Approving Agency Role
Lead Agency
Approved On
Final EIR Available Location
N/A

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
Yes
Download CSV New Search