Russian River County Sanitation District Equalization Basin Storage Project
3 Documents in Project
Summary
SCH Number
2006032018
Lead Agency
Russian River County Sanitation District
Document Title
Russian River County Sanitation District Equalization Basin Storage Project
Document Type
NOD - Notice of Determination
Received
Posted
3/20/2009
Document Description
The Project would consist of the design, construction, operation, and maintenance of an ~3.5 million gallon earthern equalization basin and appurtenant structures within the existing boundaries of the wastewater treatment plant. The purpose of the Project is to minimize the potential for National Pollutant Discharge Elimination System permit violations by increasing the District's wastewater storage capacity and adding redundancy to the system during large storm events, periods of high influent flow, and process upset conditions, thus improving discharge season reliability.
Contact Information
Name
Jeff Church
Agency Name
Russian River County Sanitation District
Contact Types
Lead/Public Agency
Phone
Location
Counties
Sonoma
Cross Streets
18400 Neeley Road
Zip
95446
Total Acres
~ 3
Parcel #
071-270-023
Waterways
Russian River, Green Valley Creek
Township
7N
Range
10W
Section
5
Base
MDB&M
Other Location Info
City/Nearest Community: Guerneville
Notice of Determination
Approving Agency
Russian River County Sanitation District
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.