Road and Bank Replacement Project, Mojave River

2 Documents in Project

Summary

SCH Number
2006031034
Lead Agency
Victor Valley Wastewater Reclamation Authority
Document Title
Road and Bank Replacement Project, Mojave River
Document Type
NOD - Notice of Determination
Received
Posted
5/1/2006
Present Land Use
Open Space, Floodplain, Low Density Residential
Document Description
During the period of December 27, 2004 to January 11, 2005, severe storms washed out an embankment that extended 195 feet around the Oro Grande Sewage Pump Station, operated and maintained by the Victor Valley Wastewater Reclamation Authority (VVWRA). On very short notice, a VVWRA contractor to provide temporary material in an effort to protect the pump station from being damaged by flooding and causing a release of raw sewage to the Mojave River. FEMA provided funding for emergency protective material in project SB-VW3B. The proposed project will remove the temporary material (1,721 CY) and replace with with 162.5 CY (195 ft. x 15 ft. x 1.5 ft.) of rip rap and 325 SY (195 ft. x 15 ft.) of fabric to be placed under the rip rap. The proposed embankment protection will replace material (fill) washed away during the flood event and will prevent future washouts during future flood events.

Contact Information

Name
Daniel P. Gallagher
Agency Name
Victor Valley Wastewater Reclamation Authority
Contact Types
Lead/Public Agency

Location

Cities
Victorville
Counties
San Bernardino
Cross Streets
Shay Avenue
Total Acres
~ 2
State Highways
66
Railways
BNSF / UPRR
Airports
Southern California Logistics Ai
Waterways
Mojave River
Township
6N
Range
5W
Section
13
Base
SBM

Notice of Determination

Approving Agency
Victor Valley Wastewater Reclamation Authority
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print