Deuel Vocational Institution New Wastewater Treatment Plant Project

2 Documents in Project

Summary

SCH Number
2006022141
Lead Agency
Corrections and Rehabilitation, Department of (California Department of Corrections and Rehabilitation)
Document Title
Deuel Vocational Institution New Wastewater Treatment Plant Project
Document Type
NOD - Notice of Determination
Received

Document Description
The California Department of Corrections and Rehabilitation (CDCR) proposes to upgrade the existing treatment facility at DVI. CDCR plans to install a membrane bioreactor (MBR) treatment system to improve water quality and correct wastewater discharge permit violations. MBR has proven to be very successful in addressing stringent effluent limitations and will provide tertiary treatment of wastewater, an upgrade over the current advanced secondary level of treatment provided at DVI. The project includes construction of a new head works, pump station, MBR facility, lift station, cooling towers, ultraviolet disinfection facility, electrical system upgrades, instrumentation and plant control system, paving and yard piping. The proposed facility would be located within the existing DVI property boundary and will be operated by existing staff.

Contact Information
Cher Daniels
California Department of Corrections and Rehabilitation
P.O. Box 942883
Sacramento, CA 94283

(916) 323-0731

Location

Cities
Tracy
Counties
San Joaquin
Cross Streets
Kasson and Lorenzen Roads
Zip
95376
Total Acres
5
State Highways
I-5
Railways
Union Pacific
Waterways
Deuel Drain and San Joaquin River

Notice of Determination

Approving Agency
California Department of Corrections and Rehabilitation
Approving Agency Role
Lead Agency
Approved On
Final EIR Available Location
CDCR Facilities Management Environmental Coordination 501 J Street, Suite 312 Sacramento, CA 95814

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
No
Download CSV New Search