16th Street-Elverta 69 kV Substation and Overhead Line Project

2 Documents in Project

Summary

SCH Number
2006022095
Lead Agency
Sacramento Municipal Utility District
Document Title
16th Street-Elverta 69 kV Substation and Overhead Line Project
Document Type
NOD - Notice of Determination
Received
Posted
5/5/2006
Present Land Use
Z: Agriculture / Low Density Residential / Agriculture

Document Description
The Sacramento Municipal Utility District (SMUD) is proposing to construct and operate a substation and appurtenant overhead line facility in the northern SMUD service area. The proposed 16th-Elverta substation is a 69,000-volt to 12,000-volt substation that will serve planned new development. The substation site will be connected to existing overhead 69 kV lines within SMUD's subtransmission grid system. A new 69 kV line will be constructed, extending about three-fourths of a mile to connect to existing lines. Underground 12 kV lines will emanate from the substation and will serve residential and commercial customers. Underground 12 kV lines will be routed to various pad-mounted step-down transformers within the service area to provide electrical power to residential and commercial customers. The 16th-Elverta site will serve largely what is known as the Gibson Ranch development, and be located within the proposed Countryside Equestrian Estates development. The APN for the site is 203-0010-16.

Contact Information
Lonn Maier
Sacramento Municipal Utility District
P.O. Box 15830 MS B203
Sacramento, CA 95852-5114

Phone : (916) 732-6566

Location

Counties
Sacramento
Cross Streets
16th Street and Elverta
Zip
95626
Total Acres
0.5
Parcel #
203-010-016
Waterways
Gibson Lake
Township
10N
Range
5E
Section
15
Base
MDMB
Other Location Info
City/Nearest Community: Elverta

Notice of Determination

Approving Agency
Sacramento Municipal Utility District Board of Directors
Approving Agency Role
Lead Agency
Approved On
Final EIR Available Location
SMUD 6201 S Street Sacramento, CA 95817-1899

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
N/A
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
Yes