Folsom Dam Safety and Flood Damage Reduction-Early Approach Channel Excavation
30 Documents in Project
Summary
SCH Number
2006022091
Lead Agency
Central Valley Flood Protection Board
Document Title
Folsom Dam Safety and Flood Damage Reduction-Early Approach Channel Excavation
Document Type
NOD - Notice of Determination
Received
Posted
8/31/2010
Document Description
NOTE: Supplemental EIR/EA / Review Per Lead
This Draft Supplemental EA/EIR describes in detail the construction and evaluates the refinements for the construction of the control structure, installation of the six tainter gates, the lining of the chute and stilling basin, and exploratory geotechnical borings.
Contact Information
Name
David Martasian
Agency Name
Central Valley Flood Protection Board
Contact Types
Lead/Public Agency
Phone
Location
Notice of Determination
Approving Agency
Central Valley Flood Protection Board
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.