Folsom Dam Safety and Flood Damage Reduction - Evening Rock Blasting

25 Documents in Project

Summary

SCH Number
2006022091
Lead Agency
Central Valley Flood Protection Board
Document Title
Folsom Dam Safety and Flood Damage Reduction - Evening Rock Blasting
Document Type
NOD - Notice of Determination
Received

Document Description
The Central Valley Flood Protection Board has prepared a Supplemental EIR to the Final EIS/EIR prepared in 2007 for the Folsom Dam Safety and Flood Damage Reduction Join Federal Project (JFP). This Supplemental EIR proposes a change in schedule for rock blasting in-the-dry and analyzes potential effects on noise, traffic, and recreation. Previously analyzed in the 2012 SEIS/EIR for the approach channel (SCH# 2012072039) was the need to excavate the rock plug using blasting methods. Blasting time frames included 1:30-2:30 pm and 10:00-11:00 am for the project duration (2013-2017). This supplemental EIR proposes an additional time from 7:00-8:00 pm for rock blasting operations to occur in-the-dry during the summer months of June through September of 2014 to 2017. Mitigation measures approved as part of the 2012 Approach Channel SEIS/EIR will be implemented to minimize potential impacts to the environment.

Contact Information
Vincent Heim
Central Valley Flood Protection Board
3310 El Camino Avenue, Rm 151
Sacramento, CA 95821

916-574-2310

Location

Coordinates
38°42'27.7"N 121°9'23.5"W
Cities
Folsom
Counties
Sacramento
Cross Streets
Folsom Lake Crossing between Folsom-Auburn Road and East Natoma Street
Zip
95630

Notice of Determination

Approving Agency
Central Valley Flood Protection Board
Approving Agency Role
Lead Agency
Approved On
Final EIR Available Location
3310 El Camino Avenue, Room 151, Sacramento, CA 95821.

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
Yes