Folsom Dam Joint Project - Flood Control and Dam Safety

30 Documents in Project

Summary

SCH Number
2006022091
Lead Agency
Central Valley Flood Protection Board
Document Title
Folsom Dam Joint Project - Flood Control and Dam Safety
Document Type
NOP - Notice of Preparation of a Draft EIR
Received
Document Description
The Corps and the Board prepared and adopted an Environmental Assessment/Initial Study and approved a Finding of No Significant Impact and a Mitigated Negative Declaration for the Folsom Dam Modification Project in 2001. That project consisted of enlarging the eight existing river outlet gates and the construction of two new outlets in the Folsom Dam. The Corp and the Board adopted an EA/IS and FONSI/MND for the construction of a Corps resident office with associated access roads and staging area to the east of the dam in 2005. This work was accomplished in 2005 in anticipatin of the construction of the enlarged outlets. Impacts identified for the construction in 2005 will be mitigated in 2006.

Contact Information

Name
Annalend Bronson
Agency Name
Reclamation Board
Contact Types
Lead/Public Agency

Location

Cities
Folsom
Counties
El Dorado, Placer, Sacramento
Zip
95821
State Highways
50
Waterways
Folsom Reservoir, American River,

Notice of Completion

State Review Period Start
State Review Period End
State Reviewing Agencies
California Department of Fish and Wildlife, North Central Region 2 (CDFW), California Department of Parks and Recreation, California Department of Transportation, District 3 (DOT), California Energy Commission, California Highway Patrol, California Native American Heritage Commission (NAHC), California Regional Water Quality Control Board, Central Valley Sacramento Region 5 (RWQCB), California State Lands Commission (SLC), Department of Water Resources, Office of Emergency Services, California, Office of Historic Preservation, Resources Agency, State Water Resources Control Board, Division of Water Rights
Local Actions
Flood Control Dam Safety
Project Issues
Aesthetics, Air Quality, Biological Resources, Cultural Resources, Cumulative Effects, Flood Plain/Flooding, Hydrology/Water Quality, Noise, Recreation, Transportation, Vegetation, Wetland/Riparian

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print