BART OKS Radio Site Project

2 Documents in Project

Summary

SCH Number
2006022080
Lead Agency
Bay Area Rapid Transit District (BART)
Document Title
BART OKS Radio Site Project
Document Type
NOD - Notice of Determination
Received
Posted
5/2/2006
Present Land Use
BART Oakland Shops Facility / M-10 (Special Industrial Zone) / Business Mix
Document Description
BART's primary trunked radio system provides BART radio coverage, serving BART operations, police and other radio users, from San Leandro to El Cerrito to downtown San Francisco. BART's existing, primary trunked radio system will be eliminated due to the dismantling of the LMA Building as part of a separate project. The project consists of installation and operation of a pre-constructed concrete shelter, an approximately 250-foot high steel radio tower, and a fixed-placement 15 kw engine generator set, located within BART's Oakland Shop facility. The radio tower would either be lattice-style with three footings, or a single monopole with one footing.

Contact Information

Name
Paul Medved
Agency Name
San Francisco Bay Area Rapid Transit District
Contact Types
Lead/Public Agency

Location

Cities
Oakland
Counties
Alameda
Cross Streets
East 8th Street / 5th Avenue
Zip
94612
Total Acres
0.14
State Highways
880, 580, 980
Railways
UPRR
Schools
Laney College
Waterways
San Francisco Bay, Lake Merritt

Notice of Determination

Approving Agency
San Francisco Bay Area Rapid Transit District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.