Lexington Raw Water Pipeline Replacement

4 Documents in Project

Summary

SCH Number
2006022031
Lead Agency
Santa Clara Valley Water District
Document Title
Lexington Raw Water Pipeline Replacement
Document Type
NOD - Notice of Determination
Received
Posted
4/6/2006
Present Land Use
Flood Control
Document Description
Replacement of a portion of the primary raw water supply pipeline to the Montevina Water Treatment Plant (MWTP) within Lexington Reservoir and near Lenihan Dam. San Jose Water Company proposes to replace approximately 10,360 feet of pipeline extending through Lexington Reservoir from SJWC's MWTP and connecting to existing pipelines on the eastern shoreline of the reservoir at two locations. The first connection is approximately 200 feet north of Soda Springs Creek and the other approximately 3,100 feet south of Soda Springs Creek. Potentially significant impacts to the environment will be avoided, minimized, or mitigated to a less than significant level. The five existing access points from Alma Bridge Road to the pipeline corridor include an access through the Los Gatos Rowing Club parking lot.

Contact Information

Name
Terry Neudorf
Agency Name
Santa Clara Valley Water District
Contact Types
Lead/Public Agency

Location

Cities
Los Gatos
Counties
Santa Clara
Cross Streets
Alma Bridge Road
Zip
95033
Parcel #
558-42-002
State Highways
17
Schools
Lexington School
Waterways
Los Gatos Creek and Lexington Reservoir
Other Location Info
City/Nearest Community: Oakmont

Notice of Determination

Approving Agency
Santa Clara Valley Water District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.