Lee Residence

2 Documents in Project

Summary

SCH Number
2006022016
Lead Agency
Santa Clara County
Document Title
Lee Residence
Document Type
NOD - Notice of Determination
Received
Posted
5/11/2006
Present Land Use
Currently vacant. Z: Hillsides
Document Description
This application is for a Building Site Approval and Grading Permit to construct a new single-family residence, guesthouse, tennis court, barn and associated driveway, and improvements to the access road. Estimated grading associated with this project equals approximately 3,000 cubic yards of cut, and 3,000 cubic yards of fill to construct the new residence, driveway, and access road improvements (Booker Creek Road). Improvements to the proposed access road includes one creek crossing (a new wider bridge to replace an existing bridge). Some retaining walls, culverts, and drainage swales are also proposed to adequately take care of drainage flowing through the access road. Per County Land Development Engineering and Fire Marshal requirements, the applicant is contributing a pro-rata share for improving a portion of the access road (Booker Creek). A number of trees shall be removed including some redwood trees within and adjacent to the bridge, madrone trees along portion of the access road, and a fir tree within the building footprint of the new residence.

Contact Information

Name
Colleen Oda
Agency Name
Santa Clara County
Contact Types
Lead/Public Agency

Location

Cities
Saratoga
Counties
Santa Clara
Cross Streets
Congress Springs Road
Parcel #
503-43-021
Waterways
Booker Creek

Notice of Determination

Approving Agency
Santa Clara County Land Development Coordinator
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.