Bluebird Canyon Landslide Remediation Project

2 Documents in Project

Summary

SCH Number
2006021128
Lead Agency
Laguna Beach, City of (City of Laguna Beach)
Document Title
Bluebird Canyon Landslide Remediation Project
Document Type
NOD - Notice of Determination
Received
Posted
4/10/2006
Present Land Use
Village Low Density, R-1, Residential

Document Description
The landslide remediation project involves the repair and stabilization of the seven acre landslide area. Repairs include vegetation removal, demolition of damaged homes, streets and utilities, a temporary shoring wall along the toe of the landslide area, installation of a 72" storm drain that connects to two existing storm drains, replacement of water and sewer lines, slope winterization, stabilization of the landslide headscarp area supporting Madison Place and Flamingo Road cul-de-sac (construction of a caisson wall and grade beam/tieback system), grading (excavation and compaction of approximately 600,000 cubic yards of disturbed material), construction of retaining walls, replacement of Flamingo Road and all associated utilities (curb, gutter, water/sewer lines, electrical, phone and cable) and surface drainage facilities (v-ditches, down drains and terrace drains).

Contact Information
Monica Tuchscher
City of Laguna Beach
505 Forest Avenue
Laguna Beach, CA 92651

Phone : (949) 497-0745

Location

Cities
Laguna Beach
Counties
Orange
Cross Streets
Bluebird Canyon, Madison Place, Oriole Drive, Didrickson Way
Zip
92651
Total Acres
7
State Highways
South Coast Hwy.
Railways
SPRR
Airports
John Wayne
Schools
Laguna Beach HS
Waterways
Pacific Ocean

Notice of Determination

Approving Agency
City of Laguna Beach
Approving Agency Role
Lead Agency
Approved On
Final EIR Available Location
505 Forest Avenue Laguna Beach, CA 92651

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
Yes