Bluebird Canyon Landslide Remediation Project

2 Documents in Project

Summary

SCH Number
2006021128
Lead Agency
City of Laguna Beach
Document Title
Bluebird Canyon Landslide Remediation Project
Document Type
NOD - Notice of Determination
Received
Posted
4/10/2006
Present Land Use
Village Low Density, R-1, Residential
Document Description
The landslide remediation project involves the repair and stabilization of the seven acre landslide area. Repairs include vegetation removal, demolition of damaged homes, streets and utilities, a temporary shoring wall along the toe of the landslide area, installation of a 72" storm drain that connects to two existing storm drains, replacement of water and sewer lines, slope winterization, stabilization of the landslide headscarp area supporting Madison Place and Flamingo Road cul-de-sac (construction of a caisson wall and grade beam/tieback system), grading (excavation and compaction of approximately 600,000 cubic yards of disturbed material), construction of retaining walls, replacement of Flamingo Road and all associated utilities (curb, gutter, water/sewer lines, electrical, phone and cable) and surface drainage facilities (v-ditches, down drains and terrace drains).

Contact Information

Name
Monica Tuchscher
Agency Name
City of Laguna Beach
Contact Types
Lead/Public Agency

Location

Cities
Laguna Beach
Counties
Orange
Cross Streets
Bluebird Canyon, Madison Place, Oriole Drive, Didrickson Way
Zip
92651
Total Acres
7
State Highways
South Coast Hwy.
Railways
SPRR
Airports
John Wayne
Schools
Laguna Beach HS
Waterways
Pacific Ocean

Notice of Determination

Approving Agency
City of Laguna Beach
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.