Bus Canyon Tributary Replacement Channel Project

3 Documents in Project

Summary

SCH Number
2006021047
Lead Agency
Ventura County Watershed Protection District
Document Title
Bus Canyon Tributary Replacement Channel Project
Document Type
NOD - Notice of Determination
Received
Posted
5/9/2006
Present Land Use
Public Facility

Document Description
The channel section between Arcane Street and Newman Street has failed and is in imminent danger of collapsing; the channel walls are currently being supported by steel bracing materials. The project includes demolition and replacement of the existing concrete-lined storm drain channel. The existing channel is a rectangular cross-section 16-feet wide and 5-feet deep; it has the capacity to convey approximately 877 cubic feet per second (cfs) of water. The proposed channel would also be a rectangular section, however the capacity would be increased to 1,275 cfs by increasing the channel to 19-feet wide and 6-feet deep. This modification would contain the 100-year flow and provide 100-year flood protection for adjacent residents.

Contact Information
Jeff Pratt
Ventura County Watershed Protection District
800 S. Victoria Avenue
Ventura, CA 93009-1610

Phone : (805) 654-2040

Location

Cities
Simi Valley
Counties
Ventura
Cross Streets
Newman Street and Arcane Street
Zip
93065
State Highways
118
Railways
Union Pacific / Metrolink
Schools
Royal High School, Sinaloa Middle, Grace Brethren
Waterways
Arroyo Simi
Township
2N
Range
18W
Section
7
Base
SBB&M

Notice of Determination

Approving Agency
Ventura County Watershed Protection District
Approving Agency Role
Lead Agency
Approved On
Final EIR Available Location
Ventura County Clerk of the Board AND Ventura County Watershed Protection District

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
No