Sunroad Harbor Island Hotel & East Harbor Island Subarea Port Master Plan Amendment (PMPA)

12 Documents in Project

Summary

SCH Number
2006021027
Lead Agency
San Diego, Port of
Document Title
Sunroad Harbor Island Hotel & East Harbor Island Subarea Port Master Plan Amendment (PMPA)
Document Type
NOD - Notice of Determination
Received
Posted
6/16/2011
Present Land Use
Commercial Recreation; Open Space; Streets
Document Description
NOTE: NOD filed 6/16/11 is Withdrawn, per Lead on 8/30/12. The Sunroad Harbor Island Hotel project (proposed Project) is proposed on the eastern end of Harbor Island. The Proposed Project is a 175-room, 4-story limited service hotel with ancillary meeting and fitness space, common areas, an exterior pool, and surface parking. The Proposed Project would be located east of the existing Sunroad Resort Marina and would replace an existing locker building and some parking, with the existing marina offices to remain. Adequate parking would remain for both the hotel and marina. The Proposed project also includes the extension of the public promenade along the Harbor Island East basin side of the hotel. The proposed Project would also reconfigure a portion of eastern Harbor Island Drive and the traffic circle at its terminus. The underlying utilities would also be realigned to accommodate the Proposed Project. The Proposed project includes a PMPA to change the land use designations of the Project site to add Promenade, and to reconfigure the existing Street and Open Space designations to be consistent with the Proposed Project. The PMPA also proposes to revise the Planning District 2 Project List (Table 9 of the Port Master Plan) to allow a total of 500 hotel rooms, currently allowed within one hotel on one parcel, to be within multiple smaller hotels throughout East harbor Island with the total combined number of hotel rooms on East Harbor Island not to exceed 500 rooms.

Contact Information

Name
Anna Buzaitis
Agency Name
San Diego Unified Port District, ELUM Department
Contact Types
Lead/Public Agency

Location

Cities
San Diego
Counties
San Diego
Cross Streets
Harbor Island Drive
Zip
92101
Total Acres
~9
Parcel #
760-010-23-00, & 760-010-11-00
State Highways
Interstate 5
Railways
SDNR
Airports
San Diego International
Waterways
San Diego Bay

Notice of Determination

Approving Agency
San Diego Unified Port District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes