Academy Avenue North Road Widening and Reconstruction Project

Summary

SCH Number
2006019016
Lead Agency
Fresno County
Document Title
Academy Avenue North Road Widening and Reconstruction Project
Document Type
NOD - Notice of Determination
Received
Posted
1/17/2006
Document Description
The California Department of Fish and Game is executing a Lake and Streambed Alteration Agreement pursuant to Section 1602 of the Fish and Game Code to the project applicant, County of Fresno, Department of Public Works and Planning. The applicant proposes: (Location A) fill the existing 12-inch concrete culvert with slurry and install an 18-inch by 62-foot metal culvert with energy dissipaters; (Location B) remove the existing steel culvert and install an 18-inch by 62-foot metal culvert with energy dissipaters; (Location C) remove the existing 10-inch steel culvert and install an 18-inch by 62-foot metal culvert with energy dissipaters; (Location D) remove the existing 12-inch concrete culvert and install an 18-inch by 62-foot metal culvert with energy dissipaters; (Location G) extension of 60-inch culvert and 48-inch culvert on the west side, streambed will be altered and canal reshaped to construct rock-lined canal; (Location H) extension of two parallel 48-inch metal culverts, on the east and west side, with energy dissipaters, streambed will be reshaped; (Location I) install 30-inch by 81-foot metal culvert with energy dissipaters; (Location J) install 30-inch by 83-foot metal culvert with energy dissipaters.

Contact Information

Name
Annette Jennings
Agency Name
California Department of Fish and Game
Contact Types
Lead/Public Agency

Location

Cities
Clovis
Counties
Fresno

Notice of Determination

Approving Agency
California Department of Fish and Game
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print