San Rafael Airport Recreational Facility

9 Documents in Project

Summary

SCH Number
2006012125
Lead Agency
City of San Rafael
Document Title
San Rafael Airport Recreational Facility
Document Type
NOD - Notice of Determination
Received
Posted
6/14/2006
Present Land Use
Present Land Uses: Private Airport and Ancillary Light Industrial Uses/ Zoning: Planned Development/ General Plan: Airport/Recreation
Document Description
The project is part of a recreational facility development. The operator proposes to improve/modify the existing bridge in order to meet state highway vehicle bridge structural standards. Work involved includes the following" removing existing bridge rails, lowering a prefabricated 25' wide bridge on top of the existing building, driving new piers into paved areas above the top of the creek bank in order to support new bridge abutments and pumping 8" of cement into the bridge deck "pan" to from the driving surface. SAA#1600-2006-0266-3.

Contact Information

Name
Jeremy Sarrow
Agency Name
California Department of Fish and Game
Contact Types
Lead/Public Agency

Location

Cities
San Rafael
Counties
Marin
Cross Streets
Smith Ranch Road/ Silvera Parkway
Zip
94903
Total Acres
4.4 of 119.5
Parcel #
155-230-10, 11, 12, 13, 14, 15, 16
State Highways
101
Railways
Northwest Pacific
Airports
San Rafael Aiport (private)
Schools
Gallinas, Vallecito, Miller Creek
Waterways
North/ South Fork Gallinas Creek, and Gallinas Creek

Notice of Determination

Approving Agency
California Department of Fish and Game
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
N/A
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print