Kelseyville Wastewater System Upgrade (Project)
6 Documents in Project
Summary
SCH Number
2006012099
Lead Agency
Lake County
Document Title
Kelseyville Wastewater System Upgrade (Project)
Document Type
NOD - Notice of Determination
Received
Posted
8/7/2008
Present Land Use
Agriculture & Public Lands
Document Description
The purpose of the project is to bring the Kelseyville Wastewater Treatment Plant (KWWTP) into compliance with wastewater discharge requirements, as required by the Central Valley Regional Valley Water Board's Cease and Desist Order, by improving hydraulic, treatment and storage capacity and upgrading the treatment process. Upgrading the KWWTP includes: (1) upgrading the existing effluent pump station to increase capacity to 0.79 million gallons per day; (2) replacing the existing facultative treatment system with a Rich-Lagoon treatment system; (3) converting a portion of the existing ponds into interim effluent storage reservoirs; and (4) installing effluent pipeline.
Contact Information
Name
Lisa Lee
Agency Name
State Water Resources Control Board, Div of Financial Assistance
Contact Types
Lead/Public Agency
Phone
Location
Counties
Lake
Cross Streets
4395 Gaddy Lane; Konocti Road
Zip
95451
Parcel #
008-039-06; 008-054-11, 12, 13, 18
State Highways
29
Schools
2 ES, 2 HS, 1 MS
Waterways
Cole Creek
Township
13N
Range
9W
Section
11, 13
Other Location Info
City/Nearest Community: Kelseyville
Notice of Determination
Approving Agency
State Water Resources Control Board
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.