Wade Bray

2 Documents in Project

Summary

SCH Number
2006012078
Lead Agency
Humboldt County
Document Title
Wade Bray
Document Type
NOD - Notice of Determination
Received
Posted
5/8/2006
Present Land Use
Present Land Use: 26, 000 sf of residential parcel is currently vacant. Zoning: Residential One Family- 6,000 sf of minimum parcel size (R-1*). General Plan: Residential Low Density (RL). Eureka Community Plan (ECP). Density 1-6 du/ acre.

Document Description
The Minor Subdivision of a 26,000 sf parcel into three (3) parcels ranging in size from +/- 6,019 to +/- 6,070 sf (net). The project includes an exception request per Section 325-9 of the Subdivision Regulations to reduce both the lot frontage and road width standards that are otherwise required. A one foot vehicular access strip will be designated along the Walnut Drive frontage and the majority of the Avalon Drive frontage to minimize traffic impacts by creating only one encroachment to be utilized by all three parcels. The parcel is relatively flat. Future development will be served by the community water and sewer. NOTE: This project includes reimbursement for traffic mitigation measures at the intersection at Hemlock and Walnut.

Contact Information
Alyson Hunter, Planner II
Humboldt County Community Development Services
3015 H Street
Eureka, CA 95501-4484

Phone : (707) 268-3731

Location

Cities
Eureka
Counties
Humboldt
Cross Streets
Avalon Drive and Walnut Drive
Zip
95503
Total Acres
26,000sf
Parcel #
303-063-02
Schools
Ridgewood Elementary School
Township
4N
Range
1W
Section
14
Base
Humboldt
Other Location Info
Cutten

Notice of Determination

Approving Agency
Humboldt County Planning Commission
Approving Agency Role
Lead Agency
Approved On
Final EIR Available Location
N/A

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
Yes
Download CSV New Search