Fremont Weir Sediment Removal Project
3 Documents in Project
Summary
SCH Number
2006012074
Lead Agency
California Department of Water Resources
(DWR)
Document Title
Fremont Weir Sediment Removal Project
Document Type
NOD - Notice of Determination
Received
Posted
3/29/2006
Present Land Use
Flood control structure.
Document Description
The Department of Water Resources has responsibility for maintaining the Yolo bypass, part of the Sacramento River Flood Control Project (SRFCP). Flood flows during the past several flood seasons have deposited sediment near the Fremont Weir at the northern end of the Yolo Bypass. These sediment deposits reduce the flow capacity of the Weir and the efficiency of the flood control system by blocking water from entering the Bypass and forcing flows to remain in the Sacramento River. Approximately 800,000 cubic yards of sediment need to be removed from in front of and downstream of the Weir; such action will resoter design grade of this portion of the flood control sustem. The sediment will be moved to a spoil site on privately owned agricultural land to the east of the Bypass. The project will take place between August 1 and November 15 of 2006.
Contact Information
Name
Jean Witzman
Agency Name
Department of Water Resources
Contact Types
Lead/Public Agency
Phone
Location
Cities
Woodland
Counties
Sutter, Yolo
Cross Streets
Road 16A
Parcel #
57-020-09, 57-020-01, 57-030-08
Waterways
Sacramento River
Township
11N
Range
3E
Section
32, 33
Notice of Determination
Approving Agency
Department of Water Resources
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.