City of Fairfield East-West Water Transmission Pipeline Project

3 Documents in Project

Summary

SCH Number
2006012062
Lead Agency
City of Fairfield
Document Title
City of Fairfield East-West Water Transmission Pipeline Project
Document Type
NOD - Notice of Determination
Received
Posted
3/22/2006
Present Land Use
Public rights of way. Major Arterial, Minor Arterial, Collector, and both RM (Medium Density Residential) and RH (High Density Residential) in Fairfield. In the City of Suisun City, PUD Commercial, Commercial Service, General Commercial, and Residential Medium Density.
Document Description
The City of Fairfield proposes to construct the East-West Water Transmission Pipeline project (also known as Crosstown), a 36-inch potable water transmission line to connect existing water mains at the Hale Ranch Road/Cordelia Road and Cement Hill Road/Clay Bank Road intersections. The purpose of the new transmission main is to pump water from the North Bay Regional Water Plant (NBR) to Cordelia providing a redundant system for the existing waterline. Several possible route alternatives were evaluated to identify the preferred alignment. The proposed route was determined based on factors such as length, avoiding utility conflicts, right-of-way acquisition, and minimizing traffic impacts. A third of the the route parallels the new Kinder Morgan 20-inch fuel line. The project would consists of 7.2 miles of 36-inch diameter concrete cylinder pipe or cement lined coated steel pipe. It would be constructed with bore and jack under-crossings at certain specified locations below railroads, streets, utilities, culverts, and creeks. A total of seventeen bore and jack crossings would be required. The project would utilize existing City of Fairfield right-of-way, where available, and as required, City of Suisun City, Solano County, and Caltrans right-of-way. The proposed route would require permanent and temporary construction easement acquisition on approximately a dozen properties. Due to the length of the proposed water line, construction would be phased over a number of years.

Contact Information

Name
Joseph A. Lucchio
Agency Name
City of Fairfield
Contact Types
Lead/Public Agency

Location

Cities
Fairfield
Counties
Solano
Cross Streets
Hale Ranch Road/Cordelia Road and Cement Hill Road/Clay Bank Road
Zip
94533
State Highways
SR 12, I-80
Railways
UPRR and Redwood Northern RR
Schools
Armijo High
Waterways
Ledgewood Creek, Laurel Creek

Notice of Determination

Approving Agency
City of Fairfield
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.