Los Vaqueros Reservoir Expansion Project [California Endangered Species Act (CESA) Incidental Take Permit 2081-2011-002-03 (ITP)].

21 Documents in Project

Summary

SCH Number
2006012037
Lead Agency
Contra Costa Water District
Document Title
Los Vaqueros Reservoir Expansion Project [California Endangered Species Act (CESA) Incidental Take Permit 2081-2011-002-03 (ITP)].
Document Type
NOD - Notice of Determination
Received
Posted
7/11/2018
Present Land Use
multiple land use des: ag and open space
Document Description
This proposed project involves use of controlled livestock grazing to enhance the habitat of the Covered Species. The Project will install and maintain 18 livestock water troughs, 8 water storage tanks, approx. 8 linear miles of water pipeline, a new solar pump to replace the existing, electric pump, and install approx. 2,100 linear feet of fencing on Contra Costa Water District's Corral Hollow Conservation property. The Project will also construct a minimum of 16 soil mounds to create habitat for small mammals that will burrow and create habitat and provide prey for the Covered Species. Project will result in permanent impacts to 0.1 acres and temporary impacts to 2.8 acres of habitat for CA tiger salamander (Abystoma californiense) and San Joaquin kit fox (Vulpes macrotis mutica). The project is expected to result in incidental take of CA tiger salamander and San Joaquin kit fox, which are designated as a threatened species under CESA. The ITP referenced above as issued by CDFW authorizes incidental take of species listed under CESA that may occur as a result of project implementation.

Contact Information

Name
Andrea Boertien
Agency Name
CDFW
Contact Types
Lead/Public Agency

Location

Cities
Antioch, Brentwood, Byron, Oakley, Walnut Creek
Counties
Alameda, Contra Costa
Cross Streets
mult
Zip
94513/14
Total Acres
~5,000
Parcel #
Multiple Parcels
State Highways
4
Airports
Byron Airport
Waterways
Sacramento-San Joaquin Delta, Kellogg Creek
Township
2S/3S
Range
2E/3E
Base
MDB&M

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No