Round Valley Meadow and Stream Headcut Repair and Elevation Restoration PROJECT WITHDRAWN
4 Documents in Project
Summary
SCH Number
2006011099
Lead Agency
California Department of Parks and Recreation
Document Title
Round Valley Meadow and Stream Headcut Repair and Elevation Restoration PROJECT WITHDRAWN
Document Type
NOD - Notice of Determination
Received
Posted
7/19/2006
Present Land Use
Recreation
Document Description
The California Department of Fish and Game is issuing an Agreement regarding Proposed Stream or Lake Alteration to the project applicant. The project consists of the reparation of Round Valley Meadow in San Jacinto State Park, where excess run-off over several years has caused incising and the creation of a channel. This wet meadow whose vegetation normally depends on ephemeral flows. The applicant proposes to fill the degraded, entrenched and eroded stream channel with fill borrowed from nearby upland and depositional sites. The applicant will then compact the fill material during placement and add top soil and re-vegetate it with on-site live trees and meadow plants. The borrowed area will also be re-vegetated. Dead trees will be used to recruit logs for grade control structures. Work will be performed by Civilian Conservation Corps, members and the applicant's staff using hand tools with mechanized equipment delivered to the project site by helicopter lift. No nesting cavities were found on the site. Less than 0.1 acre of the eroded site will be affected and only 0.65 acre of upland site.
Contact Information
Name
James Sheridan
Agency Name
California Department of Fish and Game
Contact Types
Lead/Public Agency
Phone
Location
Cities
Palm Springs
Counties
Riverside
Cross Streets
Mt. San Jacinto State Park; Trainway Drive
Zip
92262
Waterways
Long Valley Creek Headwaters
Township
4S
Range
3E
Section
22
Notice of Determination
Approving Agency
California Department of Fish and Game
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.