Crafton Hills College Master Plan 2020 Revisions

8 Documents in Project

Summary

SCH Number
2006011080
Lead Agency
San Bernardino Community College District
Document Title
Crafton Hills College Master Plan 2020 Revisions
Document Type
NOD - Notice of Determination
Received
Posted
11/17/2020
Present Land Use
Community College Campus
Document Description
Updates to the Crafton Hills College (CHC) 2017 Master Plan involve the relocation and reconfiguration of previously proposed buildings. The Proposed Project would relocate the Performing Arts Center (PAC) to replace the existing gym. The new PAC would decrease in gross square footage but would maintain the same available square footage as proposed in the 2017 Master Plan. The existing PAC would be demolished, and a new Instructional Building would be constructed in its place. The Instructional Building would be the square footage as the original proposed building. The Arts Building and East Complexes 1 and 2 would be demolished and replaced with quad open space. The quad would serve as a potential future building site. The proposed construction and renovation projects would occur within the existing CHC campus. The proposed CHC construction and renovations would be of similar architectural style and scale as existing buildings on the CHC campus. No expansion of the campus area is proposed.

Contact Information

Name
Ryan Smith
Agency Name
San Bernardino Community College District
Contact Types
Lead/Public Agency

Name
Agency Name
San Bernardino Community College District
Contact Types
Project Applicant

Location

Cities
Yucaipa
Counties
San Bernardino
Regions
Citywide, Countywide, Southern California
Cross Streets
11711 Sand Canyon Drive
Zip
92399
State Highways
Interstate 10
Schools
Yucaipa High School, Yucaipa Intermediate School

Notice of Determination

Approving Agency
San Bernardino Community College District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print