Crafton Hills College Master Plan 2020 Revisions
8 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2006011080
- Lead Agency
- San Bernardino Community College District
- Document Title
- Crafton Hills College Master Plan 2020 Revisions
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 11/17/2020
- Present Land Use
- Community College Campus
- Document Description
- Updates to the Crafton Hills College (CHC) 2017 Master Plan involve the relocation and reconfiguration of previously proposed buildings. The Proposed Project would relocate the Performing Arts Center (PAC) to replace the existing gym. The new PAC would decrease in gross square footage but would maintain the same available square footage as proposed in the 2017 Master Plan. The existing PAC would be demolished, and a new Instructional Building would be constructed in its place. The Instructional Building would be the square footage as the original proposed building. The Arts Building and East Complexes 1 and 2 would be demolished and replaced with quad open space. The quad would serve as a potential future building site. The proposed construction and renovation projects would occur within the existing CHC campus. The proposed CHC construction and renovations would be of similar architectural style and scale as existing buildings on the CHC campus. No expansion of the campus area is proposed.
- Contact Information
-
Ryan Smith
San Bernardino Community College District
Lead/Public Agency
550 E. Hospitality Lane Suite 200
San Bernardino, CA 92408
Phone : (909) 388-6936
rsmith@sbccd.edu -
San Bernardino Community College District
Project Applicant
Location
- Coordinates
- 34°2'19"N 117°6'2.3"W
- Cities
- Yucaipa
- Counties
- San Bernardino
- Regions
- Citywide Countywide Southern California
- Cross Streets
- 11711 Sand Canyon Drive
- Zip
- 92399
- State Highways
- Interstate 10
- Schools
- Yucaipa High School, Yucaipa Intermediate School
Notice of Determination
- Approving Agency
- San Bernardino Community College District
- Approving Agency Role
- Lead Agency
- Approved On
- Final Environmental Document Available at
- San Bernardino Community College District, 550 E. Hospitality Lane Suite 200, San Bernardino, CA 92408
Determinations
- (1) The project will have a significant impact on the environment
- Yes
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- No
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- Yes
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- Yes
Attachments
- Notice of Determination
- NOD - CHC Master Plan 2020 Revisions PDF 834 K
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.