Colorado River 500 Specific Plan EIR

5 Documents in Project

Summary

SCH Number
2006011066
Lead Agency
City of Blythe
Document Title
Colorado River 500 Specific Plan EIR
Document Type
NOD - Notice of Determination
Received
Posted
9/15/2006
Present Land Use
GP: Open Space
Document Description
The Colorado River 500 (CR-500) Specific Plan project would provide a mix of residential, commercial, recreation and open space uses and include both upland and in-water project elements. Proposed specific plan land use designations include: Resort Residential, Recreational Vehicle Park, Commercial Riverfront, Commercial General Resort, Commercial Service Resort, and Open Space. Maintenance dredging at the mouth of the lagoon, installation of a boat dock north of the existing boat ramp, replacement of an existing pipe culvert, pedestrian bridge at the mouth of the lagoon are also proposed to be built. The project is proposed to be built in seven phases with full build-out anticipated within six to eight years from project approval.

Contact Information

Name
Jennifer Wellman
Agency Name
City of Blythe
Contact Types
Lead/Public Agency

Location

Cities
Blythe
Counties
Riverside
Cross Streets
Intake Boulevard (US 95) and 10th Avenue
Zip
92225
Total Acres
344
State Highways
I-10
Waterways
Colorado River
Township
6S
Range
23E

Notice of Determination

Approving Agency
City of Blythe
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print