Rodeo Grounds Berm Removal and Restoration Project

4 Documents in Project

Summary

SCH Number
2006011040
Lead Agency
California Department of Parks and Recreation
Document Title
Rodeo Grounds Berm Removal and Restoration Project
Document Type
NOD - Notice of Determination
Received
Posted
12/20/2006
Present Land Use
Park/Open Space
Document Description
The project is intended to restore the natural floodplain, creek channel, and sediment transport systems at the southern end of Topanga Creek, ~ 2,500 feet upstream from the Pacific Ocean. The project consists of the removal of a berm that was installed by the former tenants of the Rodeo Grounds homes. The project grading will affect 1.8 acres of berm and 0.01 acre of delineated wetlands. An additional presently disturbed 12.4 acres will benefit from the removal of some of the exotic vegetation associated with the former residences as well as removal of the berm itself. Removal of the berm will restore over 12 acres of floodplain, allow natural reestablishment of natural creek hydrology and directly benefit endangered steelhead trout.

Contact Information

Name
Suzanne Goode
Agency Name
California Department of Parks and Recreation
Contact Types
Lead/Public Agency

Location

Counties
Los Angeles
Cross Streets
Topanga Canyon Boulevard and Pacific Coast Highway
Zip
90290
Parcel #
4448-003-904
State Highways
27 and 1
Waterways
Topanga Creek, Pacific Ocean
Other Location Info
Topanga State Park

Notice of Determination

Approving Agency
California Department of Parks and Recreation
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print