Well Test and Development Program Project: Conversion of Test Wells #5 and #6 to Production Well Status

4 Documents in Project

Summary

SCH Number
2006011023
Lead Agency
Idyllwild Water District
Document Title
Well Test and Development Program Project: Conversion of Test Wells #5 and #6 to Production Well Status
Document Type
NOD - Notice of Determination
Received
Posted
1/25/2007
Present Land Use
Open Space
Document Description
Recent drought conditions in the Idyllwild area have reduced the Idyllwild Water District's well production such that the District has determined it is necessary to located additional well sites to maintain adequate public water supplies. The original project consisted of the drilling of two test wells, at two separate locations, in Idyllwild to evaluate the potential water production capacity at each site. The wells were drilled and tested and determined to adequate for conversion to District production wells, based on the water quality analyses. The changes being considered are: 1. Provide a pump and other production well equipment at Test Wells #5 and #6 and convert them to production wells #28 and 27, respectively. 2. Test and clean-out the well to the point that it can be connected to the District's water distribution system. A short pipeline will be installed from the well site to the existing water lines in adjacent roadways. 3. Pump, treat and deliver the groundwater from the well to the District's water customers.

Contact Information

Name
Terry Lyons
Agency Name
Idyllwild Water District
Contact Types
Lead/Public Agency

Location

Counties
Riverside
State Highways
243
Township
5S
Range
2E, 3E
Section
7, 12
Other Location Info
City/Community: Idyllwild

Notice of Determination

Approving Agency
Idyllwild Water District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print