Middle Fiddler Green Siphon Replacement Project

3 Documents in Project

Summary

SCH Number
2005122121
Lead Agency
Placer County Water Agency
Document Title
Middle Fiddler Green Siphon Replacement Project
Document Type
NOD - Notice of Determination
Received
Posted
3/3/2006
Present Land Use
The project area occurs within a rural residential area and is zoned as Farm/4.6 acre minimum; the General Plan designation is Farm/Rural Residential
Document Description
PCWA is proposing to replace an approximately 950-foot-long segment of the Middle Fiddler Green Siphon pipe. The proposed maintenance project entails replacing this existing 24-inch-diameter raw water pipeline that has been leaking for several years. The pipeline would be replaced in two phases. Phase 1 involves replacing a 273-foot-long section from the south side of Auburn Ravine to Ophir Road. Phase 2 of the project involves replacing the remaining 677 feet of pipeline, from the northern end of Phase 1 (Ophir Road) to the Middle Fiddler Green Canal.

Contact Information

Name
Ken Powers
Agency Name
Placer County Water Agency
Contact Types
Lead/Public Agency

Location

Counties
Placer
Cross Streets
Ophir Road
Parcel #
040-130-034,054;040-380-014,013,012,044,008,009
State Highways
I-80
Railways
UPRR
Waterways
Auburn Ravine
Township
12N
Range
8E
Section
16
Base
Auburn
Other Location Info
Ophir

Notice of Determination

Approving Agency
Placer County Water Agency
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print