Uvas Creek Bridge Replacement

4 Documents in Project

Summary

SCH Number
2005122072
Lead Agency
California Department of Transportation, District 4
Document Title
Uvas Creek Bridge Replacement
Document Type
NOD - Notice of Determination
Received
Posted
8/11/2006
Document Description
The project would replace the existing scour damaged Uvas Creek Bridge. The new 3-lane bridge will be located adjacent to the existing 2-lane bridge, which will be demolished. It will consist of continuous reinforced concrete (RC) or precast/prestressed concrete girders resting on two diaphragm abutments with one RC pier in the middle. To accommodate the highway realignment, a soil nail wall approximately 130-m (150-yd) long with an average height of 6-m (19.7-ft) will be constructed immediately east of the new bridge along the north side of Route 152 beginning at the Burchell Road intersection. Other improvements include a left-turn lane, wider shoulders, upgraded bridge rails, and metal beam guardrails.

Contact Information

Name
Jared Goldfine
Agency Name
California Department of Transportation
Contact Types
Lead/Public Agency

Location

Cities
Gilroy
Counties
Santa Clara
Cross Streets
Hecker Pass Highway (Route 152) @ Burchell Drive
Zip
95020
State Highways
152
Waterways
Uvas Creek

Notice of Determination

Approving Agency
California Department of Transportation
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print