Angora 3 Erosion Control Project and Angora Creek Fisheries Enhancement Project

11 Documents in Project

Summary

SCH Number
2005122039
Lead Agency
El Dorado County
Document Title
Angora 3 Erosion Control Project and Angora Creek Fisheries Enhancement Project
Document Type
NOD - Notice of Determination
Received
Posted
8/2/2007
Present Land Use
TRPA Regional Plan Z: Single Family Residential, Resource Management, Recreation, Public Service
Document Description
The primary component of the project is the replacement of two failing culverts with an open conspan arch. The existing culverts constitute a barrier to fish passage during both the spring and fall spawning periods. The new conspan arch will facilitate the passage of fish and allow the 100-year flood event to pass while maintaining natural hydrologic dynamics. The project will also involve enhancing the habitat conditions adn floodplain function by removing fill from the floodplain surrounding the existing culvert and along the streambank adjacent to the culvert. Construction is tentative scheduled to occur during a 50 day period in August - October 2008.

Contact Information

Name
Jane Hershberger
Agency Name
California Tahoe Conservancy
Contact Types
Lead/Public Agency

Location

Cities
South Lake Tahoe
Counties
El Dorado
Cross Streets
Mt. Rainer at Lake Tahoe Blvd. and North Upper Truckee Road
Zip
96150
Parcel #
Private easements, Various Public Parcels, and County ROW
State Highways
SR 89, Hwy. 50
Airports
Lake Tahoe Airport
Schools
Lake Tahoe Enviro. Education School and S. Tahoe HS
Waterways
Angora Creek and Upper Truckee River
Township
12N
Range
18E
Section
18, 19
Base
MD
Other Location Info
Meyers

Notice of Determination

Approving Agency
California Tahoe Conservancy
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
N/A
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print