Lone Tree Road Bridge Replacement at Anderson Creek

2 Documents in Project

Summary

SCH Number
2005122022
Lead Agency
Shasta County
Document Title
Lone Tree Road Bridge Replacement at Anderson Creek
Document Type
NOD - Notice of Determination
Received
Posted
3/1/2006
Present Land Use
Agricultural and Rural Residential Z: Agricultural GP: Agricultural
Document Description
Replace the existing one-span, 40-foot long by 14-foot wide Lone Tree Road Bridge over Anderson Creek with a new two span 88-foot long by 24-foot wide bridge on the same horizontal alignment and a raised vertical alignment. The project will also include 340' of new approach work to match the new, raised grade. A temporary on-site detour will be provided immediately upstream (north) of the existing bridge. The proposed detour will require approximately 0.08 acres of temporary right-of-way. Roadwork at the west end will consist of cutting enough of the original ground to get the structural section in place. This should not exceed more than one foot. Roadwork at the east end will consist of fill material. Sufficient cut material should be generated to complete the fill work for this project. The fills should not extend higher than four feet above original ground. The detour will be constructed on fill material, and then removed once the project is complete. Construction is tentatively schedule to begin in the spring of 2006.

Contact Information

Name
Dan Little
Agency Name
Shasta County
Contact Types
Lead/Public Agency

Location

Counties
Shasta
Cross Streets
Lone Tree Road / Balls Ferry Road
Zip
96022
Total Acres
~ 1
Waterways
Anderson Creek & Sacramento River
Township
30N
Range
3W
Section
PBR Gr
Base
MDBM
Other Location Info
NE of Cottonwood
Other Information
Section: Grant

Notice of Determination

Approving Agency
Shasta County Board of Supervisors
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.