Motel Inn Siphon
3 Documents in Project
Summary
SCH Number
2005121165
Lead Agency
City of San Luis Obispo
Document Title
Motel Inn Siphon
Document Type
NOD - Notice of Determination
Received
Posted
10/5/2012
Present Land Use
Spans three zinesl C-T-S, C/OS-5, & R-1
Document Description
The California Department of Fish and Game is executing a Lake and Streambed Alteration Agreement pursuant to Section 1602 of the Fish and Game Code to the Project applicant, Mr. Freddy Otte. The Project consists of replacing an existing sewer line that has become exposed as it crosses the Creek with a new, 6-inch diameter high density polyethylene (HDPE) line that will run approximately 12 feet below the existing grade of the Creek. The line will be installed utilizing horizontal direction drilling (HDD) that will require drilling pits to be located on either side of the creek approximately 150 feet from tops of banks. An existing, stable gravel bar on the east side of the creek will be used as a staging area for emergency equipment should a frac-out occur. Requirements for Contingency Plans for cleanup operations in the event of frac-out have been made part of the Streambed Alteration Agreement.
Contact Information
Name
Robb Tibstra
Agency Name
California Department of Fish and Game
Contact Types
Lead/Public Agency
Phone
Location
Cities
San Luis Obispo
Counties
San Luis Obispo
Zip
93401
Railways
UPRR
Schools
San Luis High School
Waterways
San Luis Obispo Creek
Base
Mtdiablo
Notice of Determination
Approving Agency
California Department of Fish and Game
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes