Diaz Road Lift Station Project - Addendum to IS/MND

5 Documents in Project

Summary

SCH Number
2005121097
Lead Agency
Eastern Municipal Water District (EMWD)
Document Title
Diaz Road Lift Station Project - Addendum to IS/MND
Document Type
NOD - Notice of Determination
Received
Posted
11/17/2016
Present Land Use
Open Space
Document Description
On September 19. 2007, the Eastern Municipal Water District's (Eastern) Board approved and authorized the CEQA certification of the Diaz Road Lift Station Replacement Project - Final Initial Study and MND. The project would replace the existing lift station; construct approx. 700 linear feet of 42-inch diameter gravity interceptor sewer to demolish the existing lift station, restoring the site to it natural condition. At this time, Eastern is proposing minor changes to the project as originally described. The changes include increasing the number of electric driven submersible pumps from three to four; increasing the depth of the wet well from 45 feet to 47 feet; reducing the size of the gravity interceptor sewer from 42-inch to 33-inch diameter; and the need for dewatering during construction. None of these changes were foreseen at the time the July 2007 IS/MND was prepared. The previously adopted IS/MND adequately discusses the potential impacts of the project and the minor changes noted above required the preparation of an addendum.

Contact Information

Name
Helen Stratton
Agency Name
County of Riverside
Contact Types
Lead/Public Agency

Location

Cities
Temecula
Counties
Riverside
Cross Streets
Diaz Road and Rancho Way
Zip
92591
Parcel #
921-740-003
State Highways
I-15, 79
Schools
James Day MID, Chaparrel HS
Waterways
Murrieta Creek
Township
7S,8S
Range
3W
Section
2, 35
Base
SBB&M

Notice of Determination

Approving Agency
County of Riverside
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print