Ocean Beach / Hotel Circle Place Bikeway

2 Documents in Project

Summary

SCH Number
2005121095
Lead Agency
City of San Diego
Document Title
Ocean Beach / Hotel Circle Place Bikeway
Document Type
NOD - Notice of Determination
Received
Posted
4/11/2006
Present Land Use
OF-1-1 (Special Flood Hazard Area); IL-3-1 (Industrial Light); RS-1-1 (Residenital Single-Unit)
Document Description
Site Development Permit and Coastal Development Permit to allow for the construction of a Class I and III bike route. The extension of the existing Ocean Beach Bike Path to Hotel Circle Place would be approximately 4,100 lineal feet (LF) to be utilized by both pedestrians and bicyclists. The bikeway would be approximately a 10-foot-wide permanent porous concrete path with an additional two-foot-wide shoulder and/or clear zone on either side. The bikeway extension is located within the San Diego River area. The project alignment is within the OF-1-1, IL-3-1, and the RS-1-1 zones of the Mission Valley Community Planning Area of the City and County of San Diego.

Contact Information

Name
E. Shearer-Nguyen
Agency Name
City of San Diego
Contact Types
Lead/Public Agency

Location

Cities
San Diego
Counties
San Diego
Cross Streets
Pacific Coast Highway / Morena Blvd. / Hotel Circle Place
State Highways
I-5/I-8/SR163- Pacific Coast Hwy
Airports
SD Int'l Airport-Lindberg Field
Waterways
San Diego River, San Diego Bay
Other Location Info
Old Town, Ocean Beach

Notice of Determination

Approving Agency
City of San Diego
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.