La Costa Village Center Townhomes - GPA 04-10, ZC 04-06, LCPA 04-09, CT 04-08, 04-07, CDP 04-17, and CP 04-03
3 Documents in Project
Summary
SCH Number
2005121062
Lead Agency
City of Carlsbad
Document Title
La Costa Village Center Townhomes - GPA 04-10, ZC 04-06, LCPA 04-09, CT 04-08, 04-07, CDP 04-17, and CP 04-03
Document Type
NOD - Notice of Determination
Received
Posted
7/10/2006
Present Land Use
Vacant
Z: L-C (Limited Control)
GP: RM (Residential Medium)
Document Description
Request for a MND and Mitigation Monitoring and Reporting Program, General Plan Amendment, Local Coastal Program Amendment, and Zone Change to change the General Plan and Local Coastal Program Land Use designations from Residential Medium (RM, 4-8 du/ac) to Residential Medium-High (RMH, 8-15 du/ac) and Open Space (OS), and to change the Citywide Zoning and Local Coastal Program Zoning designations from Limited Control (L-C) to Residential Density-Multiple with a Qualified Development Overlay (RD-M-Q) and Open Space (OS), and a Tentative Tract Map, Site Development Permit, Coastal Development Permit, Condominium Permit, and Special Use Permit to subdivide and grade a 14.4 acre site into 2 residential lots for 53 condominium units, 1 driveway lot, and 1 open space lot.
Contact Information
Name
Jessica Galloway
Agency Name
City of Carlsbad
Contact Types
Lead/Public Agency
Phone
Location
Cities
Carlsbad
Counties
San Diego
Cross Streets
West of El Camino Real and north of Dove Lane
Total Acres
14.4
Parcel #
215-050-73
State Highways
I-5, S-12, and S-11
Railways
NCTD
Airports
McClellan / Palomar
Schools
Carlsbad Unified Schools
Waterways
Bataquitos Lagoon
Notice of Determination
Approving Agency
City of Carlsbad
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.