Route 238 Corridor Improvement Project
5 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2005112116
- Lead Agency
- Hayward, City of (City of Hayward)
- Document Title
- Route 238 Corridor Improvement Project
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 11/30/2007
- Present Land Use
- Existing land uses adjacent to the project corridor include residential, commercial, and open space uses.
- Document Description
- The Route 238 Corridor Improvement Project is intended to improve traffic conditions along Foothill and Mission Boulevard between Highway 580 and Industrial Parkway. The proposed project includes changes in circulation, changes in lane directions and controls, a downtown one-way loop street system, improvements to the Mission Boulevard/Carlos Bee Boulevard intersection, and other roadway improvements along Foothill and Mission Boulevards.
- Contact Information
-
Morad Fakhrai
City of Hayward
777 B Street
Hayward, CA 94541
Phone : (510) 583-4740
Location
- Cities
- Hayward
- Counties
- Alameda
- Cross Streets
- Foothill Boulevard and Mission Boulevard
- Zip
- 94541
- Parcel #
- Numerous
- State Highways
- SR 238, 92, 185
- Railways
- UPRR, BART
- Schools
- Bret Harte MS, Harder ES, CSU, St. Clement's School, Moreau Cath
- Waterways
- San Lorenzo Creek, Sulphur Creek, Ward Creek, Zeile Creek
- Township
- 3S
- Range
- 2W
- Section
- 18
- Base
- MD
- Other Information
- Schools: Moreau Catholic HS, Tennyson HS, Bowman ES, Chavez MS.
Notice of Determination
- Approving Agency
- City of Hayward
- Approving Agency Role
- Lead Agency
- Approved On
- Final Environmental Document Available at
- Hayward Main Library, 835 C St., Hayward, CA 94541; Weekes Branch Library, 27300 Patrick Ave., Hayward, CA 94544; City Hall, Engineering & Transportation, 2nd Floor and Permit Center, 1st Floor, 777 B St., Hayward, CA 94541; City of Hayward website: www.hayward-ca.gov
Determinations
- (1) The project will have a significant impact on the environment
- Yes
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- No
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- Yes
- (6) Findings were made pursuant to the provisions of CEQA
- Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.