Centex Homes SAA # 1600-2006-0097-R2

3 Documents in Project

Summary

SCH Number
2005112108
Lead Agency
City of Elk Grove
Document Title
Centex Homes SAA # 1600-2006-0097-R2
Document Type
NOD - Notice of Determination
Received
Posted
6/6/2008
Present Land Use
The project site is vacant. Zoning: RD-2, RD-4, RD-5, RD5(F), and O. General Plan Designations are Low Density Residential and Rural Residential.
Document Description
The California Department of Fish and Game is executing a Lake and Streambed Alteration Agreement number 1600-2006-0097-R2 pursuant to Section 1602 of the Fish and Game Code to the project applicant, Centex Homes. The project includes the construction of one roadway crossing consisting of two 3 foot high by 5 foot wide by 85-foot long box culverts; one clear-span crossing 20 feet wide by 60 feet long; three outfalls into the pond/detention basin, and filling 2.25 acres of a pond. Temporary impacts to the stream zone amount to 1,615 square feet and permanent impacts to the stream zone amount to 1,385 permanent square feet.

Contact Information

Name
Amy Kennedy
Agency Name
California Department of Fish and Game
Contact Types
Lead/Public Agency

Location

Cities
Elk Grove
Counties
Sacramento
Cross Streets
Bond Road/Waterman Road
Parcel #
127-0010-002,014,018,019,020,040
State Highways
99
Railways
Union Pacific
Waterways
Whitehouse Creek, Laguna Creek, tributaries
Township
7N
Range
6E
Section
30

Notice of Determination

Approving Agency
California Department of Fish and Game
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print