Potable and Reclaimed Water Storage Tanks

3 Documents in Project

Summary

SCH Number
2005112091
Lead Agency
City of American Canyon
Document Title
Potable and Reclaimed Water Storage Tanks
Document Type
NOD - Notice of Determination
Received
Posted
2/15/2006
Present Land Use
Residential Estate, with a Golf Course overlay GP: Agriculture, Watershed and Open Space (AWS)
Document Description
The City of American Canyon proposes to construct two above-ground welded steel water storage tanks located just outside the southeastern city limits. The proposed 2.5-MG tank will store potable water and help provide the necessary additional storage capacity for the City's water system, enabling the City to meet its water storage capacity goals. The proposed 1.0-MG tank will store reclaimed, tertiary-treated water from the City's wastewater recycling facility and will facilitate the City's reclaimed water program. The project also includes installation of two 18-inch pipelines which will convey both potable and reclaimed water to and from the water tanks plus one 18" high pressure pipeline for future connection to a high pressure pump station. The pipelines will be installed within a 25-foot wide permanent utility easement and a 10-foot wide temporary construction easement.

Contact Information

Name
Robert Weil
Agency Name
City of American Canyon
Contact Types
Lead/Public Agency

Location

Cities
American Canyon, Napa
Counties
Napa
Cross Streets
Flosden Road / Newell Drive and Granite Spring Way
Zip
94503
Total Acres
3.0
Parcel #
059-043-065
State Highways
29
Waterways
American Canyon Creek
Township
4N
Range
3W
Section
19
Base
Cordella

Notice of Determination

Approving Agency
City of American Canyon
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.