Draft 2050 Lincoln General Plan Update

5 Documents in Project

Summary

SCH Number
2005112003
Lead Agency
City of Lincoln
Document Title
Draft 2050 Lincoln General Plan Update
Document Type
NOD - Notice of Determination
Received
Posted
4/3/2008
Present Land Use
Various existing General Plan land use/zoning designations.
Document Description
The project is the adoption of the Lincoln 2050 General Plan. The 2050 General Plan is a comprehensive update to all of the following mandated elements: Land Use, Circulation, Conservation, Open Space, Noise and Safety. The Housing Element has been separately updated in accordance with State time lines. In addition, the 2050 General Plan contains two optional elements: Public Services and Facilities and Economic Development. The 2050 General Plan addresses a planning framework and policies for a 45-year planning period and completely replaces the previous General Plan adopted in 1988, with the exception of the Housing Element, which was separately updated.

Contact Information

Name
Rod Campbell
Agency Name
City of Lincoln
Contact Types
Lead/Public Agency

Location

Cities
Loomis, Rocklin, Roseville
Counties
Placer
Cross Streets
Various
Total Acres
28,910
State Highways
65, 193
Railways
UPRR
Airports
Lincoln Regional Airport
Schools
Various
Waterways
Various

Notice of Determination

Approving Agency
City of Lincoln
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print