Division Street Corridor Recycled Water Project
2 Documents in Project
Summary
SCH Number
2005111134
Lead Agency
City of Lancaster
Document Title
Division Street Corridor Recycled Water Project
Document Type
NOD - Notice of Determination
Received
Posted
2/21/2006
Present Land Use
General Plan: Heavy Industry, Light Industry, Urban Residential; Zoning: Cemetery, School, Heavy Industry, Light Industry, Urban/Residential, Desert-Mountain
Document Description
The project proposes to connect to the existing County Sanitation District No. 14 of Los Angeles County (District No. 14) recycled water transmission line to provide recycled water to the City. Under the proposed project, the City of Lancaster would construct a recycled water distribution system to provide up to an estimated 1,090 acre-feet-per-year (afy) of disinfected tertiary treated recycled water (recycled water) produced at the Lancaster Water Reclamation Plant (LWRP) to users along Division Street. This distribution system would include a main pipeline, lateral pipelines, storage tank, and pump station. The proposed 24-inch recycled water main pipeline would connect to the District No. 14 recycled water transmission line at Avenue E and travel approximately 4.5 miles along Division Street to Lancaster Boulevard. Laterals up to 12-inches in diameter would branch off this main line to serve specific users.
Contact Information
Name
Steve Dassler
Agency Name
City of Lancaster
Contact Types
Lead/Public Agency
Phone
Location
Cities
Lancaster
Counties
Los Angeles
Cross Streets
Division Street, Lancaster Boulevard, Ave E, Ave F, Ave G, Ave H, Ave I, Sierra Highway
Zip
93539
Total Acres
12
Parcel #
Multiple
State Highways
Highway 14, SR 138 (Ave D)
Schools
Multiple:Antelope Valley HS, Piute, Phoenix, Linda Verd
Waterways
Amargosa Creek, Piute Ponds, Rosamond Dry Lake
Notice of Determination
Approving Agency
City of Lancaster
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.