Quarry Creek Reclamation Project

4 Documents in Project

Summary

SCH Number
2005111124
Lead Agency
City of Oceanside
Document Title
Quarry Creek Reclamation Project
Document Type
NOD - Notice of Determination
Received
Posted
3/29/2011
Present Land Use
Closed mining operation. Zoning - mixed - residential, commercial and industrial.
Document Description
The CDFG is issuing an Agreement regarding the Stream Alteration to the project applicant, Hanson Aggregates Pacific Southwest, Inc. The Project is limited to contouring Buena Vista Creek to a 150 foot channel width, with 2.5:1 (horizontal to vertical) side slopes. Overbank terraces will be constructed on both sides of the channel, resulting in an overall channel width of approximately 194 feet. The total channel cross-section will include a low-flow channel, an expanded channel including the Riparian zone, an overbank terrace, a transition zone and an upland zone. A minimum of seven feet of freeboard above 100-year flow rates (assuming a densely vegetated channel with natural obstructions) shall be provided, thus obviating the need for ongoing instream vegetation and channel maintenance.

Contact Information

Name
Darren Bradford
Agency Name
DFG
Contact Types
Lead/Public Agency

Location

Cities
Carlsbad, Oceanside
Counties
San Diego
Cross Streets
El Camino Real and Oceanside Blvd.
Zip
92054
State Highways
78
Railways
NCTD Sprinter Line
Waterways
Buena Vista Creek and Lagoon

Notice of Determination

Approving Agency
DFG
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print