East Valley Water District's (EVWD) Addendum No. 1 to the Mitigate Negative Declaration Plant 40 Disposable Resin Ion Exhange System for Uranium Removal Project
5 Documents in Project
Summary
SCH Number
2005111015
Lead Agency
East Valley Water District
Document Title
East Valley Water District's (EVWD) Addendum No. 1 to the Mitigate Negative Declaration Plant 40 Disposable Resin Ion Exhange System for Uranium Removal Project
Document Type
NOD - Notice of Determination
Received
Posted
8/17/2009
Document Description
The project consists of (1) installing the plumbing and foundation for the nitrate ion exchange treatment unit and then place the unit on the foundation, along with storage tanks to support operations, and connect it to the onsite incoming raw water delivery system and to the onsite potable water treatment system; and (2) store onsite waster water generated by treatment and dispose of the wastewater to the existing SARI system every other day for treatment and disposal in accordance with existing waste discharge requirements.
In compliance with Section 15164 of the State CEQA Guidelines, EVWD has reviewd the project and determined that an addendum to the adopted MNd is the appropriate CEQA action for this project. EVWD has determined none of the conditions described in Section 15162 of the State CEQA Guidelines requiring preparation of a subsequent negative declaration have occurred and that adoption of Addendum No. 1 to the adopted MND is the appropriate action.
Contact Information
Name
Eliseo Ochoa
Agency Name
East Valley Water District
Contact Types
Lead/Public Agency
Phone
Location
Cities
Highland
Counties
San Bernardino
Cross Streets
3rd Street and Palm Avenue
State Highways
30
Airports
San Bernardino International
Waterways
City Creek and Santa Ana River
Township
1S
Range
3W
Section
4
Base
SBM
Notice of Determination
Approving Agency
East Valley Water District
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
N/A
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.