Hollister Road Bridge Replacement Project, Agreement 2009-0040-R4

2 Documents in Project

Summary

SCH Number
2005109023
Lead Agency
San Luis Obispo County Community College District
Document Title
Hollister Road Bridge Replacement Project, Agreement 2009-0040-R4
Document Type
NOD - Notice of Determination
Received
Posted
5/14/2009
Document Description
The CDFG is executing a Lake and Streambed Alteration Agreement pursuant to Section 1602 of the Fish and Game Code to the Project applicant, Mr. Edralin Maduli. The proposed Project would remove an existing bridge and build a new bridge in its place. The existing bridge is 44 ft wide and would be replaced by a new 2 lane bridge 54 ft wide. The site would be dewatered using coffer dams and pipes to convey flow through the site. To accommodate the new bridge, the stream would be excavated to a depth of ~7 ft below the stream bed elevation to remove 25 supporting pilings and portions of both banks would be excavated to accommodate rock slope protection (RSP). Equipment would access the site from one bank, traveling through an area where RSP would be installed later. The RSP would extend for a distance of ~75 ft upstream and downstream from the bridge centerline. The RSP would also extend across the stream channel near the upstream Project limits at sufficient depth to allow accumulation of native materials over the RSP. The stream bed would be reconfigured to mimic existing pools and riffles, thereby avoiding changes in stream hydrology, and 2 log habitat structures would be installed among the RSP. Concrete abutments would be placed outside the top of bank and temporary falsework would be placed in the stream channel. The new concrete bridge would be poured in place, after which the falsework and the dewatering dams and pipes would be removed from the stream channel. Potentially hazardous materials such as lead paint, creosoe laden timbersm and other materials would be removed and disposed of at a facility licensed to accommodate such materials. The site would be stabilized and revegetated using native plant species.

Contact Information

Name
Mike Hill
Agency Name
California Department of Fish and Game
Contact Types
Lead/Public Agency

Location

Counties
San Luis Obispo

Notice of Determination

Approving Agency
DFG
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print