Magalia Reforestation Center Greenhouse Expansion Project

2 Documents in Project

Summary

SCH Number
2005102105
Lead Agency
California Department of Forestry and Fire Protection (CAL FIRE)
Document Title
Magalia Reforestation Center Greenhouse Expansion Project
Document Type
NOD - Notice of Determination
Received
Posted
12/15/2005
Present Land Use
P-Q/WP - Public, Quasi-Public
Document Description
A greenhouse measuring approximately 40' x 120' will be constructed on an area previously cultivated just east of an existing 42' x 60' greenhouse. Water and power lines will be extended from the existing greenhouse via a narrow trench approximately 2' deep and 100'-150' long. A small out building and additional propane tank will be located next to the greenhouse for the boiler for the floor heating system. An additional propane tank may be located next to this out building if the existing tank does not have adequate capacity for both boilers. Concrete pathways 6-8' wide shall be constructed around the periphery of both greenhouses to facilitate all weather forklift access. Grow lights may be installed concurrently with construction or some time in the future as funding becomes available. Construction equipment and supplies will be staged in the vicinity of the construction site. Future expansion may include the construction of shade structures to the east of the new greenhouse.

Contact Information

Name
David Derby
Agency Name
Department of Forestry and Fire Protection
Contact Types
Lead/Public Agency

Location

Counties
Butte
Cross Streets
Steiffer Road and Cory Road
Zip
95956
Total Acres
0.5
Parcel #
065-110-019
Schools
Cedarwood ES
Waterways
Paradise Lake, Little Butte Creek
Township
23N
Range
3E
Section
13
Base
MDBM
Other Location Info
City/Nearest Community: Magalia

Notice of Determination

Approving Agency
Department of Forestry and Fire Protection
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print