Village at Los Carneros Residential Project

4 Documents in Project

Summary

SCH Number
2005101137
Lead Agency
City of Goleta
Document Title
Village at Los Carneros Residential Project
Document Type
NOD - Notice of Determination
Received
Posted
4/3/2009
Document Description
The Applicant intends to alter the streambed by constructing a span bridge, 50 by 75 ft, across the creek for access to a new 275 multi-family residential development. The foundations of the bridge are outside the banksm and extension to a culvert on an existing drainage swale located in the center of the development. This swale will be the location of the mitigation and will be designed as a green belt. The project will remove 9 willows, 2 coast live oaks and 2 sycamores. The project is located within a developed light industrial area, by the rail road and Highway 101, within city limits.

Contact Information

Name
Natasha Lohmus
Agency Name
Department of Fish and Game
Contact Types
Lead/Public Agency

Location

Cities
Goleta
Counties
Santa Barbara
Cross Streets
Los Carneros Road, Calle Koral (1 S. Los Carneros Road)
Total Acres
16.11
Parcel #
073-330-024, 027
State Highways
US 101, SR 217
Railways
Southern Pacific RR
Airports
Santa Barbara Municipal Airport
Schools
Brandon ES, El Rancho ES, Dos Pueblos HS, Isla Vista ES, La Pate
Waterways
Tecolotito Creek, Los Carneros Lake, Los Carneros Creek, San Pedro Creek, El Encanto Creek, Deve
Other Information
Schools: La Patera ES, Goleta Valley JHS, Kellogg ES, UCSB. Waterways: Devereux Creek, Pacific Ocean, Goleta Slough, Devereux Slough.

Notice of Determination

Approving Agency
DFG
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print