San Diego Creek Interim Maintenance of Basins No. 1, 2, and 3

2 Documents in Project

Summary

SCH Number
2005101074
Lead Agency
Orange County
Document Title
San Diego Creek Interim Maintenance of Basins No. 1, 2, and 3
Document Type
NOD - Notice of Determination
Received
Posted
1/2/2007
Present Land Use
PLU: Creek channel; GP: N/A; Z: N/A
Document Description
The California Department of Fish and Game is executing a Lake and Streambed Alteration Agreement number 1600-2005-0620-R5 pursuant to Section 1602 of the Fish and Game Code to the project applicant, County of Orange. The operator proposes to alter the streambed and banks through the removal of sediment and vegetation in an effort to restore the original design configuration and hydraulic capacity of Basins 2 and 3, and the Upper Channel Reach of San Diego Creek. The project activities are intended to complete emergency work conducted from December of 2003 through March 2004. The operator shall mitigate for 18.2 acres of both permanent and temporary impacts to stream channel and riparian habitat.

Contact Information

Name
Naeem Siddiqui
Agency Name
California Department of Fish and Game
Contact Types
Lead/Public Agency

Location

Cities
Irvine, Newport Beach
Counties
Orange
Cross Streets
I-405 to Jamboree Road
State Highways
I-405
Airports
John Wayne Airport
Schools
University of California, Irvine
Waterways
Pacific Ocean
Township
6S
Range
9W
Section
58-60
Base
SBB&M

Notice of Determination

Approving Agency
California Department of Fish and Game
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print