Bode Final Map Subdivision Case No. FMS-04-17/CDP-04-118/SP-04-136

2 Documents in Project

Summary

SCH Number
2005092092
Lead Agency
Humboldt County
Document Title
Bode Final Map Subdivision Case No. FMS-04-17/CDP-04-118/SP-04-136
Document Type
NOD - Notice of Determination
Received
Posted
12/19/2005
Present Land Use
Undeveloped / Rural Residential Agriculture / Rural Residential
Document Description
Approval of a Coastal Development Permit, Special Permit and Final Map Subdivision for the subdivision of an approximately 29 acre parcel into 8 lots ranging from 2.5 acres in size to 6.9 acres. This subdivision is for Phase III, lots 14 through 21, of the Mid-County Ranch Subdivision. The parcels will be served by on-site water and sewage disposal systems. A Special Permit is required for Design Review. The project includes a request for an exemption to the solar access requirements of HCC §322.5-3 through 8.

Contact Information

Name
Michael Wheeler
Agency Name
Humboldt County Community Development Services
Contact Types
Lead/Public Agency

Location

Counties
Humboldt
Cross Streets
Walker Pt. Rd., Hidden Valley Rd.
Zip
95524
Total Acres
29
Parcel #
402-171-25
State Highways
US 101
Railways
Eureka So.
Schools
Freshwater
Waterways
Humboldt Bay
Township
5N
Range
1W
Section
20
Base
HB&M
Other Location Info
Indianola area

Notice of Determination

Approving Agency
Humboldt County Planning Commission
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print