SAA No. R1-04-0455 'Randall Bar'

3 Documents in Project

Summary

SCH Number
2005092072
Lead Agency
Humboldt County
Document Title
SAA No. R1-04-0455 'Randall Bar'
Document Type
NOD - Notice of Determination
Received
Posted
7/31/2006
Present Land Use
The site is an existing rock quarry that has been mine intermittently for over 50 years. The site is located in a mixed conifer/hardwood forest adjacent to the South Fork Eel River. Surrounding land uses include a mixture of agriculture, timber harvesting, rural residential, recreation and surface mining. Ranching occurs half-mile to the north and south. The Town of Garberville is located half mile to the northeast, the 8-lot Rivercrest Subdivision to the east, Tooby Park approximately 700 feet south across the river, Randall Sand and Gravel extraction and processing operations downstream, and the Garberville Airport one-quarter mile southwest. Z: Agriculture Exclusive / Qualified Heavy Industrial GP: Agricultural Suburban / Industrial, Resource-related; Garberville Community Plan
Document Description
The project proposes the removal of flood-washed alluvial material for commercial purposes on the South Fork Eel River, in Humboldt County.

Contact Information

Name
Donna L. Cobb
Agency Name
California Department of Fish and Game
Contact Types
Lead/Public Agency

Location

Counties
Humboldt
Cross Streets
Sprowel Creek Road / Camp Kimptu
Zip
95542
Total Acres
20
Parcel #
222-091-06
State Highways
US 101
Airports
Garberville Airport
Waterways
South Fork Eel River
Township
4S
Range
3E
Section
25
Base
HM
Other Location Info
South Fork Eel River, tributary to the Eel River.

Notice of Determination

Approving Agency
California Department of Fish and Game
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print