Branciforte Creek Subdivision

6 Documents in Project

Summary

SCH Number
2005092025
Lead Agency
City of Santa Cruz
Document Title
Branciforte Creek Subdivision
Document Type
NOD - Notice of Determination
Received
Posted
7/5/2011
Present Land Use
Vacant residential / R-1-5 / Residential low density
Document Description
The stormwater runoff from the residential development project would be routed through stormdrain lines into an underground detention facility. From the detention facility, water would flow through a buried 24-inch utility line discharging into a perforated distribution line which allows water to flow through a rock energy dissipater. Work includes placement of 56 cubic yards of 14 ton riprap to slow and dissipate water flow prior to entering the creek channel. A utility trench would be excavated from the underground detention facility located outside the riparian corridor to the outfall and rock energy dissipater. Excavated material would be temporarily side cast along the trench and used as backfill once the 24-inch stormdrain line is installed. An access road will also be constructed to the outfall. CDFG is executing a Lake and Streambed Alteration Agreement Number 1600-2011-0050-R3 pursuant to Section 1602 of the Fish and Game Code to the project Applicant, KB Home South Bay, Inc.

Contact Information

Name
Suzanne DeLeon
Agency Name
DFG Bay Delta Region
Contact Types
Lead/Public Agency

Location

Cities
Santa Cruz
Counties
Santa Cruz
Cross Streets
Market and Goss
Zip
95060
Total Acres
9.29
Parcel #
008-491-14, 15
State Highways
1, 9, &17
Railways
Union Pacific
Schools
UCSC
Waterways
San Lorenzo River

Notice of Determination

Approving Agency
DFG
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print