UC Davis Medical Center Same Day Surgery Center Project
2 Documents in Project
Summary
SCH Number
2005092024
Lead Agency
Regents of the University of California
Document Title
UC Davis Medical Center Same Day Surgery Center Project
Document Type
NOD - Notice of Determination
Received
Posted
1/9/2006
Present Land Use
UC Davis Medical Center Long Range Development Plan Specialized Clinical Services Zone
Document Description
The proposed Same Day Surgery Center is a single-story outpatient facility with approximately 8,500 assignable and 12,000 gross square feet. The building will be built using modular construction, with primary building components fabricated off-site, in order to expedite the construction. It will contain four operating suites designed to accommodate vibration sensitive ophthalmologic procedures, one procedure room, twelve post anesthesia recovery beds, sterile processing, supply, support areas, administrative space and building support rooms. Utility services will connect to the central plant lines located directly across from the project site.
Contact Information
Name
John E. Zimmermann
Agency Name
University of California Planning Design & Construction
Contact Types
Lead/Public Agency
Phone
Location
Cities
Sacramento
Counties
Sacramento
Cross Streets
2nd Avenue / 49th Street
Total Acres
~ 0.3
State Highways
99/50
Railways
UPRR
Airports
Sacramento Executive
Schools
Marion Anderson ES and Tahoe Park ES
Waterways
American / Sacramento Rivers
Township
8N
Range
5E
Section
17
Base
MDBM
Notice of Determination
Approving Agency
University of California
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.